Solution 02 · Cost & TOTEX stress-test for bids

Protect the tender price
you commit to.

The figure in your bid is the figure you will build to, above all on a lump-sum turnkey (LSTK) contract. We test the estimate behind your tender price: contingency, escalation and lifecycle TOTEX, before the proposal is signed off.

Mutual NDA · redacted files accepted

Scroll ↓

Try it

Same estimate.
Two levels of confidence.

P50 means an even chance that the final cost stays within the price. P80 means four chances in five. The gap between the two is the margin you are really putting at risk.

Switch between them to see what changes in this illustrative estimate.

Illustrative estimate · €420M SWRO desalination DBOM

Confidence level

Contingency

vs estimate class range

6.5% · under-sized

Escalation & indirects

vs 42-month execution

−3.1% · gap

Vendor quote coverage

packages vs scope

88% · covered

Margin exposure

€9.6M unfunded

Adjust before price lock

Contingency

vs estimate class range

11.8% · adequate

Escalation & indirects

vs 42-month execution

−0.8% · aligned

Vendor quote coverage

packages vs scope

88% · covered

Margin exposure

€1.2M residual

Defensible at P80

Illustrative example. No client data.

Estimate maturity

The less defined the scope,
the wider the range.

We check whether the contingency matches the real maturity of the estimate, not the maturity the schedule assumes.

Class 5

Concept screening

Project definition

0–2%

Typical accuracy

−20/−50% · +30/+100%

Class 4

Study / feasibility

Project definition

1–15%

Typical accuracy

−15/−30% · +20/+50%

Class 3

Budget / tender basis

Project definition

10–40%

Typical accuracy

−10/−20% · +10/+30%

Class 2

Control / bid estimate

Project definition

30–75%

Typical accuracy

−5/−15% · +5/+20%

Class 1

Check estimate

Project definition

65–100%

Typical accuracy

−3/−10% · +3/+15%

Indicative accuracy ranges from AACE International recommended practice 18R-97 (process industries). Cover Intelligence applies these principles; it is not a member of, affiliated with or endorsed by AACE International.

01

Contingency sizing

Checked against estimate maturity and comparable projects, with P50 and P80 made explicit.

02

Escalation & indirect costs

Indices, base dates and site overheads tested against the real execution timeline.

03

Vendor quotes

Exclusions, validity periods and scope coverage checked package by package.

04

Cost vs operating boundary

No double-counting and no gaps between packages: spares, commissioning, first fills.

05

Risk allowances

Contingency traced to the risk register, not a flat percentage. Delay damages included.

06

Lifecycle cost

Energy and maintenance assumptions checked against the commercial model, the financing case and the performance guarantees.

What we challenge

Six places
margin usually leaks.

The findings come back ranked by margin impact, with the adjustment we recommend for each.

From model to decision

A number the board can defend.

Input

Your cost model

Cost breakdown, vendor quotes, risk register. Redacted files are fine.

Under NDA

Review

Independent challenge

Every major cost driver checked for realism against estimate maturity.

AACE-informed

Output

Ranked findings

Exposures ranked by margin impact, with the adjustment we recommend.

Before price lock

Before the price is locked, test it.

A confidential first call to agree the scope and timing of the stress-test.