Sectors · desalination, oil & gas, petrochemicals, utilities, waste-to-energy

Where complex bids
are won and lost.

Tender advisory for five capital-intensive sectors: desalination and water, oil and gas, petrochemicals, industrial utilities and waste-to-energy, across Europe, the Middle East, Asia, North America and Australia. Project references are available under NDA.

Energy recovery units in a desalination plant
Valve and steam on an oil and gas plant walkway
Process pumps in a petrochemical plant
Pipe rack over industrial utility basins
Boiler and flue gas treatment in a waste-to-energy plant

Water & desalination

Oil & gas

Petrochemicals

Industrial utilities

Waste-to-energy

5 sectors · 5 contract models · references under NDA

Scroll ↓

Five sectors

Where bids break,
sector by sector.

01

Water & desalination

Seawater reverse osmosis and water treatment: energy-hungry operating costs, marine works and hard performance guarantees. In the Gulf, most large plants are procured as IWPs under BOO or BOT agreements, judged on the water tariff over 20 to 30 years, not on capital cost alone.

Where bids break

Energy and membrane operating costs

Marine intake and outfall

Performance guarantees

02

Oil & gas

Process packages, vendor-driven capital cost and high-contingency profiles. Most packages are tendered as EPC or LSTK contracts, where a single price carries the scope, schedule and performance risk.

Where bids break

Long-lead equipment

Vendor quote coverage

Contingency profile

03

Petrochemicals

Complex interfaces, licensor packages and brownfield tie-ins.

Where bids break

Licensor interfaces

Tie-ins and brownfield works

Shutdown windows

04

Industrial utilities

Utility systems where lifecycle cost and O&M exposure decide the margin.

Where bids break

Availability regimes

O&M cost realism

Lifecycle cost

05

Waste-to-energy

Technology risk, contractual allocation and lifecycle economics. Plants are usually procured as DBOM contracts or PPPs, where operating guarantees and availability weigh as much as the construction price.

Where bids break

Waste composition risk

Emission guarantees

Gate fees and offtake

Each sector breaks bids in its own way. Knowing where to look is most of the work.

Contract models

Same plant.
Different risk.

Who carries what, by contract model: indicative contractor-side exposure. The deeper the blue, the more of that risk sits with you.

Design

Construction

Operation

Financing

EPC

Engineering, procurement & construction

Fixed scope, often lump-sum turnkey: price and schedule risk sit with you.

High

High

Low

Low

EP

Engineering & procurement

Design and supply without construction: interfaces decide the margin.

High

Low

Low

Low

BOT

Build, operate, transfer

You build, finance and operate before handing back: lifecycle economics and lenders dominate.

High

High

High

High

DBOM

Design, build, operate, maintain

Long O&M period, usually publicly financed: lifecycle cost realism wins.

High

High

High

Low

PPP

Public-private partnership

Long concession with private finance: risk is allocated clause by clause.

High

High

High

High

On a phone, the four columns read Design · Construction · Operation · Financing.

Where

Europe

Middle East

Asia

North America

Australia

Experience gained on bids across these regions. Project references are shared under NDA.

Bring us the hard one.

A confidential 30-minute discussion about the tender that worries you most.